SidePlate Projects

Structural engineers, architects, building owners and contractors nationwide are increasingly turning to SidePlate to ensure their next project has the most reliable, safest, cost-effective steel frame connections available. Our patented technologies are helping secure buildings throughout the country against earthquakes, bomb blasts and extreme weather conditions.

Take a look, and see why industry leaders are choosing SidePlate. For your convenience, our projects can be sorted by using the project list to the right.

arrow
Behavioral & Social Sciences Building

San Bernardino

Owner California State University San Bernardino

Architect DMJM

Engineer J.C. Lian Associates

Contractor Soltek Pacific

Fabricator Maya Steel Fabrications, Inc.

Erector Bickerton Iron

>> View Case Study
arrow
Concrete Tilt-up

Mira Loma

Owner Pacific Newport Builders, Inc.

Architect HPA, Inc.

Engineer Kramer & Lawson, Inc.

Contractor Pacific Newport Builders, Inc.

Fabricator Spec Iron, Inc.

Erector Spec Iron, Inc.

>> View Case Study
arrow
Ft. Belvoir Community Hospital

Ft. Belvoir

Owner US Army Corps of Engineers

Architect HDR, Inc.

Engineer HDR, Inc.

Contractor Turner-Gilbane

Fabricator Banker Steel Company

Erector L.R. Willson & Sons, Inc.

>> View Case Study
arrow
Large Industrial Buildings

Manning

Owner GRANT FOREST PRODUCTS INC.

Architect AECOM

Engineer UMA/GEM Buildings

Contractor GEM Buildings

Fabricator Macuch Steel

Erector Macuch Steel

>> View Case Study
arrow
Pacific Command Headquarters

Camp H.M. Smith, Oahu

Owner US Navy

Architect Atkins Benham, Inc.

Engineer Atkins Benham, Inc. & Baldridge and Associates

Contractor Dick Pacific Construction Company, Ltd.

Fabricator Brooklyn Iron Works, Inc.

Erector Swanson Steel Company, Inc.

>> View Case Study
arrow
Palomar Recycled Water Booster Station

San Diego

Owner EMWD

Architect Krieger & Stewart

Engineer MHP, Inc.

Contractor Schuler Eng.

Fabricator Remco Steel

Erector Remco Steel

>> View Case Study
arrow
Santa Clara Valley Medical Center Bed Building Replacement

San Jose

Owner County of Santa Clara

Architect Anshen & Allen

Engineer Rutherford + Chekene

Contractor Turner Construction Company

Fabricator Gayle Manufacturing

Erector California Erectors

>> View Case Study
arrow
Sea-Tac Air Traffic Control Tower (ATCT)

Seattle-Tacoma Intl Airport

Owner Department of Transportation/Federal Aviation Administration

Architect URS Greiner / Woodward Clyde

Engineer URS Greiner / Woodward Clyde

Contractor PCL Construction Services, Inc.

Fabricator XL Iron Works Surrey,BC,Canada

Erector Pacific Erectors

>> View Case Study
arrow
Sherman Oaks Galleria Phase II

Sherman Oaks

Owner Douglas Emmett Company

Architect Gensler

Engineer KPFF Consulting Engineers

Contractor Peck Jones Construction

Fabricator Schuff Steel Company

Erector Schuff Steel Company

>> View Case Study
arrow
University of Minnesota Ambulatory Care Center

Minneapolis

Owner University of Minnesota Health

Architect CannonDesign/Studio Five Architects

Engineer CannonDesign

Contractor McGough

Fabricator LeJeune Steel Company

Erector Danny's Construction

>> View Case Study
arrow
US Federal Courthouse

 

Owner GSA

Architect H3 Hardy Collaboration Architeture, LLC

Engineer Walter P. Moore

Contractor Yates Construction

Fabricator Steel, Inc.

Erector Steel, Inc.

>> View Case Study
arrow
Wentworth-Douglass Hospital Inpatient Bed Tower Project

Dover

Owner Wentworth-Douglass Hospital

Architect Leo A. Daly

Engineer Leo A. Daly

Contractor Harvey Construction Corp.

Fabricator Novel Ironworks

Erector Rose Steel

>> View Case Study