Case Studies
- Concrete Tilt-up
- Large Industrial Buildings
- Sherman Oaks Galleria Phase II
- Wentworth-Douglass Hospital Inpatient Bed Tower
Recent Projects
- Bayport Apartment Seismic Strengthening
- Kaiser Hospital Support Building
- Custom Residence
How Engineers Work With SidePlate
Engineers nationwide are turning to SidePlate to make projects safer, stronger and more cost-effective.
Sea-Tac Air Traffic Control Tower (ATCT)
Seattle-Tacoma Intl Airport,WA
Client
Department of Transportation/Federal Aviation Administration
Architect
URS Greiner / Woodward Clyde
Structural Engineer
URS Greiner / Woodward Clyde
General Contractor
PCL Construction Services, Inc.
Fabricator
XL Iron Works Surrey,BC,Canada
Erector
Pacific Erectors
Description
265’ Air Traffic Control Tower Using Antiterrorist Bomb Blast Security Criteria
“The professional help from SidePlate® was beyond expectation. ‘That’ made a difference.”
– Silvano Patrignani,
XL Ironworks
Challenges
- To satisfy the FAA’s Antiterrorist Bomb Blast Security Criteria using a braced dual system for the steel frame tower for improved economics and security
- Project budget and schedule precluded the use of other connection systems without additional testing due to SAC’s imposed limitations on the extent of their prequalification
Solutions
- SidePlate’s unique versatility allowed the use of its SureBrace2™ connection system, which combines a moment frame with a super X-braced SCBF connection system to take advantage of unlimited column depth prequalification (W27x cruciform column used) for maximum economy and robustness.
