Engineers nationwide are turning to SidePlate to make projects safer, stronger and more cost-effective.
Ft. Belvoir Community Hospital
Ft. Belvoir, VA
Client
U.S. Army Corps of Engineers
Architect
HDR, Inc.
Structural Engineer
HDR, Inc.
General Contractor
Turner-Gilbane
Fabricator
Banker Steel Company
Erector
L.R. Willson & Sons, Inc.
Description
Nine-story, 760,000 sf Hospital; Two Four-story, 180,000 sf Outpatient Buildings; and Two Three-story, 109,000 sf Buildings Totaling over 1.3 Million sf Using DoD’s UFC Low Level of Protection for Progressive Collapse.
Challenges
- To solve structurally challenging areas resulting from architecturally pleasing attributes
- To satisfy DoD’s Antiterrorism Progressive Collapse criteria for tie forces and Alternate Path (AP) for discontinuous columns
Solutions
- The main body of the hospital had two extending wings with very limited room for any lateral load resisting elements. The curvature and story height posed challenges with drift displacements, but were economically satisfied using SidePlate’s® connection stiffness
- SidePlate easily satisfied perimeter tie force requirements as well as AP requirements due to superior performance in full-scale blast and progressive collapse testing
- In addition, the wind criteria governed the design element when using SidePlate, and no increase in beam or column sizes were required